News

Columbia Road Construction (new)

Columbia Road Construction (new)

Aug 9, 2013 at 12:57 pm

 

It’s been closed most of the summer but motorists can once again travel over parts of the Columbia road reconstruction project.   The four-point-two million dollar road fix stretches from demers avenue to 11th avenue south.   Crews have re-opened one lane in each direction while closing the loops connecting the overpass to demers avenue.    work teams still need to put up street lighting and grade the surrounding areas.   The project is expected to be substantially completed by September 3rd.

Jarrod Thomas

Posted By Jarrod Thomas

Talk Show Host, Operations Manager

Jarrod Thomas's Profile

Current Weather

For The Grand Forks Area

Alert: River Flood Warning

Temp: 32°F (0°C)

Dewpoint: 18

Wind: 8mph SE

Weather: Overcast

Calendar